Project Lifecycle Protection
Construction projects are complex ecosystems of risk. We navigate CAR (Contractors All Risk) and EAR (Erection All Risk) policies to distinguish between defective workmanship, design errors, and fortuitous damage. We speak the language of engineers and quantity surveyors.

DWG NO: CON-001
SCALE: 1:100
APPROVED
Technical Competencies
Defect vs. Resultant Damage
The critical LEG2/LEG3 distinction. We investigate whether the damage was caused by a defect (excluded) or if it is resultant damage to correctly installed property (covered).
DSU (Delay in Start-Up)
Complex scheduling analysis to determine how a physical loss event impacts the critical path of the project and the resulting financial delay.
Crumbling Foundations & Soil
Geotechnical assessment of subsistence and heave claims. We review soil reports and structural engineering designs to identify liability.
/// Executive Summary
"Our involvement begins at the notification of loss, ensuring that the 'make-safe' costs are segregated from the betterment, and that the project schedule impact is accurately determined."